| 404184700 | Form 17 | 4/23/2025 | 4/30/2025 | SHUT-IN | 3 | CONTINUOUS | GAS | 0 | NO FLOW | 600 | 600 | No | -- | -- | Pre-P&A. 3 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. |
| 404148672 | Form 17 | 3/21/2025 | 4/1/2025 | PLUNGER LIFT | 48 | CONTINUOUS | GAS | 0 | NO FLOW | 644 | 657 | No | -- | -- | Remediation follow up test. 48 PSI gas flow blew down to 0 PSI within twelve minutes of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 4/9/2024 | 4/16/2024 | | 5 | Down to Zero | -- | 0 | Down to Zero | 639 | 644 | No | No | No | Annual Test. 5 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 5/12/2023 | 5/22/2023 | | 16 | Down to Zero | -- | 0 | Down to Zero | 639 | 588 | No | None | None | Annual Test. 16 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 3/3/2022 | 3/14/2022 | | 39 | Continuous | -- | 0 | No Flow | 636 | 631 | No | None | None | |
| Click for Specifics | Full | 4/15/2021 | 11/1/2021 | | 0 | Down to Zero | -- | 0 | Down to Zero | 674 | 664 | No | None | None | |
| 402579043 | Form 17 | 11/28/2020 | 1/20/2021 | GAS LIFT | 2 | NO FLOW | -- | 0 | NO FLOW | 660 | 660 | No | -- | -- | 6 Month Abatement System Follow Up Test, 2 PSI slight gas blew down to 0 PSI within seconds. No pressure or flow observed for the remainder of the test. PDC will continue to monitor pressure on a monthly basis and submit 6 month follow up test. |
| 402456021 | Form 17 | 3/27/2020 | 7/29/2020 | FLOWING | 400 | GAS | -- | 0 | NO FLOW | 668 | 668 | No | -- | -- | annual test, 400 PSI blew down to 0 PSI within first minute of test. no pressure or flow observed for remainder of test. PDC will attempt to collect sample and submit results if available. PDC wil follow up with a remediation sundry. |
| Click for Specifics | Light | 3/30/2019 | 8/18/2020 | | 4 | | -- | 0 | | 677 | 677 | No | No | No | |