Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-39343Kodak North FD
25-161HN
PDC ENERGY INC
69175
PR
6/1/2024
WATTENBERG
90750
WELD  123
SENW 26 6N67W 6
333035
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1530 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404551238Form 172/11/20262/19/2026PLUNGER LIFT44CONTINUOUS WATER AND GAS0 NO FLOW 615622No---- 
404451365Form 1711/18/202511/25/2025FLOWING13CONTINUOUS GAS AND LIQUID HYDROCARBON0 WHISPER 681681No---- 
Click for SpecificsFull1/21/20251/28/2025 7Down to Zero--0No Flow981980NoNoNoAnnual Test.  7 PSI blew down to 0 PSI within first few seconds of test.  No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
404019875Form 1711/27/202412/9/2024PLUNGER LIFT8CONTINUOUS GAS0 NO FLOW 982984No----Remediation follow up test. 8 PSI whisper blew down to 0 PSI within first five minutes of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull2/13/20242/26/2024Plunger Lift12Down to Zero--0Down to Zero775775NoNoNoAnnual Test.  12 PSI blew down to 0 PSI within first few seconds of test.  No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
403498812Form 178/14/20238/16/2023PLUNGER LIFT53CONTINUOUS GAS0 NO FLOW 538538Yes----High Pressure Verification test. 53 PSI gas flow blew down to 0 PSI in 5 minutes. No flow or pressure for remainder of test. PDC will collect a sample and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull6/2/20236/12/2023 46Down to Zero--0Down to Zero10181021NoNoNoAnnual Test. 46 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
403152999Form 178/29/20228/31/2022FLOWING38DOWN TO 0 GAS0 NO FLOW 10141013No----Remediation follow up test, 38 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly.
402970684Form 172/23/20223/2/2022FLOWING96DOWN TO 0 WATER H200 CONTINUOUS 660663Yes--YesTest per NTO. Gas on open for 2 seconds then water for duration of test. Produced ~1 gallon of water total. Water sample collected.
402867709Form 1711/9/202111/10/2021FLOWING12DOWN TO 0 GAS0 NO FLOW 670671No----Re-test after 16 day build up. Gas on open for 40 seconds and died. No flow for remainder of test.
402678540Form 174/30/20215/3/2021FLOWING99CONTINUOUS GAS0 NO FLOW 729729YesYesNoTest per NTO. Gas at open. Sampled gas then reopened full. Down to a whisper at 5 minutes. Slowing to vapor at 9 minutes. Dead at 12 minute mark. Dead for remainder of test.
402357538Form 173/25/20203/31/2020FLOWING1WHISPER --0 NO FLOW 7070No----Test after DOFP. Slight whisper on open, died in 10 seconds.
402283356Form 171/8/20201/13/2020SHUT-IN3DOWN TO 0 --0 NO FLOW 00No----Test prior to toe-prep/frac.