Click for Specifics | Full | 10/15/2024 | 11/12/2024 | | 4 | Continuous | None | -- | No Flow | 331 | 333 | No | N | N | Surface Casing produced no liquid. |
Click for Specifics | Full | 9/1/2023 | 10/16/2023 | Plunger Lift | 1 | Whisper | None | -- | No Flow | 401 | 407 | No | N | N | Surface Casing produced no liquid. |
Click for Specifics | Full | 6/20/2022 | 7/11/2022 | Plunger Lift | 4 | Continuous | None | -- | Whisper | 316 | 316 | No | N | N | Surface Casing produced no liquid. |
Click for Specifics | Full | 6/25/2021 | 7/19/2021 | Plunger Lift | 5 | Continuous | None | -- | Whisper | 265 | 268 | No | N | N | Surface Casing produced no liquid. |
Click for Specifics | Full | 5/11/2020 | 12/21/2020 | Plunger Lift | 1 | WHISPER | -- | -- | DOWN TO 0 | 743 | 731 | No | No | No | Surface Casing produced no liquid. |
Click for Specifics | Full | 12/2/2019 | 12/10/2019 | | 1 | Whisper (Very Low Flow) | | 0 | Down To Zero | 0 | 0 | No | No | No | Production casing and tubing shut in. Surface casing produced no liquid. |
400944269 | Form 17 | 11/3/2015 | 11/30/2015 | | 19 | GAS | -- | 0 | DOWN TO 0 | 835 | 822 | No | -- | -- | DID NOT SHUT WELL IN DURING TEST. SC PRODUCED NO FLUIDS DURING TEST. SHUT IN SC FOR 15 MIN ENDED WITH A WHISPER. |