403896506 | Form 17 | 8/19/2024 | 8/22/2024 | FLOWING | 81 | DOWN TO 0 | GAS | 0 | NO FLOW | 425 | 400 | No | -- | -- | Mitigation Bradenhead Test
WBD submitted on doc# 403151603 |
403499831 | Form 17 | 8/15/2023 | 8/17/2023 | FLOWING | 86 | DOWN TO 0 | GAS | 0 | NO FLOW | 395 | 419 | No | -- | -- | Mitigation Bradenhead Test
WBD submitted on doc# 403151603. |
403151584 | Form 17 | 8/26/2022 | 8/30/2022 | FLOWING | 126 | CONTINUOUS | GAS | 0 | NO FLOW | 713 | 742 | Yes | Yes | -- | Mitigation Bradenhead Test
WBD attached
|
402768766 | Form 17 | 7/26/2021 | 8/5/2021 | FLOWING | 148 | DOWN TO 0 | GAS | 0 | NO FLOW | 767 | 767 | Yes | Yes | No | 148 psig initial surface casing pressure. Gas samples taken. |
402458556 | Form 17 | 7/30/2020 | 8/8/2020 | FLOWING | 148 | DOWN TO 0 | -- | 0 | NO FLOW | 661 | 678 | Yes | Yes | No | 148 BHP. Down to 0 w/in 5 min. Bradenhead Gas sample taken, production sample on file.
|
402029371 | Form 17 | 3/26/2019 | 5/1/2019 | FLOWING | 118 | WHISPER | -- | 0 | NO FLOW | 715 | 715 | Yes | Yes | No | Bradenhead test per Order No. 1V. 687 - Order 4.b. 118 psig initial surface casing. Down to 0 psig within five minutes. Gas sample taken. Crestone will submit a Form 4 sundry with a mitigation plan by 05-25-2019 per COGCC Order No. 1-232 NTO Guidance.
|
401582558 | Form 17 | 3/19/2018 | 3/22/2018 | SHUT-IN | 217 | WHISPER | -- | 0 | NO FLOW | 1230 | 1254 | Yes | Yes | No | post stim test
Braden whispered and blew down immediately, observed no flow during test |