Click for Specifics | Full | 3/1/2024 | 6/18/2024 | | 1 | Whisper | None | -- | No Flow | 225 | 243 | No | N | N | Surface Casing produced no liquid. |
Click for Specifics | Full | 11/22/2023 | 12/11/2023 | Plunger Lift | 1 | Whisper | None | -- | No Flow | 261 | 280 | No | N | N | Surface Casing produced no liquid. |
Click for Specifics | Full | 1/26/2022 | 2/21/2022 | Plunger Lift | 0 | No Flow | None | -- | No Flow | 222 | 222 | No | N | N | Surface Casing produced no liquid. |
Click for Specifics | Full | 2/5/2021 | 3/15/2021 | Plunger Lift | 2 | Continuous | None | -- | No Flow | 276 | 272 | No | No | No | Surface Casing produced no liquid. |
Click for Specifics | Full | 1/23/2020 | 6/8/2020 | | 1 | Whisper (Very Low Flow) | | 0 | Down To Zero | 286 | 243 | No | No | No | Surface casing produced no liquid. |
Click for Specifics | Full | 3/16/2019 | 12/10/2019 | | 1 | Whisper (Very Low Flow) | | 0 | Down To Zero | 250 | 253 | No | No | No | Surface casing produced no liquid. |
400980873 | Form 17 | 9/10/2013 | 1/29/2016 | | 250 | GAS | -- | 1 | GAS | -- | -- | No | -- | -- | SC PRODUCED 5 GALLONS OF CONDENSATE DURING THE TEST. WELL HAD FRAC VALVES STILL ATTACHED, CASING INACCESSIBLE. |