Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-34641SRC Bestway
B-2-11-14NCHZM
PDC ENERGY INC
69175
SI
1/1/2025
WATTENBERG
90750
GREELEY/WELD  123
SENE 2 5N66W 6
423325
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1239 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404360165Form 179/11/20259/18/2025FLOWING0NO FLOW NONE0 NO FLOW 422422No----Remediation follow up test. 0 PSI, no pressure or flow observed for entire of the test. Operator will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull9/25/202410/1/2024 0No Flow--0No Flow445445NoNoNoAnnual Test.  0 PSI, with no pressure or flow observed for the entire 30-minute test.  PDC will monitor pressure and re-test according to bradenhead policy.
403529665Form 179/13/20239/14/2023PLUNGER LIFT57CONTINUOUS GAS0 NO FLOW 409408Yes----Annual test. 57 PSI gas flow blew down to 0 PSI in 10 minutes. No flow for remainder of the test. PDC will collect a sample and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull11/10/202211/29/2022 12Down to Zero--0Down to Zero352349NoNoneNone 
402847499Form 1710/4/202110/20/2021PLUNGER LIFT8DOWN TO 0 --0 NO FLOW 413413No----Post Production test, 8 PSI blew down to 0 PSI within first minute of test, no pressure or flow observed for the remainder of the test. PDC will monitor bradenhead pressure monthly and submit annual test.
402721037Form 174/20/20216/16/2021PLUNGER LIFT1WHISPER --0  436437No----Abatement system follow up test, 1 PSI whisper blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible.
402473533Form 178/21/20208/24/2020 140VAPOR --0 VAPOR 525510Yes----Annual Test 140 PSI with continuous flow, blew down to 0 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry.
Click for SpecificsLight6/5/201911/27/2019 10  0No Flow955955NoNoNo