| 404285604 | Form 17 | 6/27/2025 | 7/18/2025 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 600 | 600 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes.
|
| Click for Specifics | Light | 1/13/2025 | 1/28/2025 | | 0 | | -- | 0 | | 500 | 500 | No | No | No | |
| Click for Specifics | Full | 1/29/2024 | 2/5/2024 | Plunger Lift | 0 | No Flow | -- | 0 | No Flow | 200 | 203 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 3/16/2023 | 3/27/2023 | | 0 | Down to Zero | -- | 0 | Down to Zero | 295 | 297 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 4/25/2022 | 5/9/2022 | | 0 | No Flow | -- | 0 | No Flow | 529 | 529 | No | No | No | |
| Click for Specifics | Full | 6/5/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 287 | 279 | No | None | None | |
| Click for Specifics | Light | 4/21/2020 | 5/11/2020 | | 0 | | -- | 0 | | 212 | 212 | No | No | No | |
| Click for Specifics | Light | 4/10/2019 | 8/18/2020 | | 0 | | -- | 0 | | 472 | 472 | No | No | No | |