| 403985144 | Form 17 | 11/5/2024 | 11/6/2024 | | 18 | CONTINUOUS | GAS | 0 | NO FLOW | 561 | 561 | No | -- | -- | PRE P/A- Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 11/30/2023 | 12/11/2023 | Plunger Lift | 16 | Continuous | None | -- | No Flow | 600 | 600 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
| 402920255 | Form 17 | 1/5/2022 | 1/7/2022 | | 14 | CONTINUOUS | GAS | 0 | NO FLOW | 697 | 694 | No | -- | -- | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 8/11/2021 | 9/13/2021 | Plunger Lift | 18 | Continuous | None | -- | Whisper | 753 | 753 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 12/9/2020 | 12/21/2020 | Plunger Lift | 15 | Continuous | -- | -- | No Flow | 811 | 808 | No | No | No | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 12/14/2019 | 12/20/2019 | | 36 | Gas | -- | 1 | Gas | -- | -- | No | No | No | Production casing and tubing shut in. Surface casing produced no liquid. |
| 400407997 | Form 17 | 4/10/2013 | 4/23/2013 | PLUNGER LIFT | 20 | MUD | -- | 0 | DOWN TO 0 | 436 | 452 | No | -- | -- | Surface casing produced cement powder immediately after opening surface died. Shut in for 5 minutes to see if would pressure up. Remained dead. |