| 404542104 | Form 17 | 1/28/2026 | 2/11/2026 | SHUT-IN | 48 | CONTINUOUS | GAS | 0 | DOWN TO 0 | 0 | 0 | No | -- | -- | |
| 404507292 | Form 17 | 1/13/2026 | 1/15/2026 | SHUT-IN | 90 | CONTINUOUS | GAS | 6 | CONTINUOUS | 0 | 0 | No | -- | -- | |
| 404058550 | Form 17 | 1/13/2025 | 1/15/2025 | SHUT-IN | 32 | CONTINUOUS | GAS | 0 | WHISPER | 0 | 0 | No | -- | -- | Remediation follow up test. 32 PSI continuous gas flow blew down to 0 PSI within fifteen minutes of test. Whisper gas observed throughout remainder of test, not a recordable psi for last 15 minutes of test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403669322 | Form 17 | 1/26/2024 | 1/29/2024 | SHUT-IN | 22 | CONTINUOUS | GAS | 0 | NO FLOW | 1330 | 1330 | No | -- | -- | Annual test. 22 PSI gas flow blew down to whisper in 3.5 minutes, whisper until 8 minute mark, no flow or pressure for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 1/31/2023 | 2/13/2023 | | 14 | Down to Zero | -- | 0 | Down to Zero | 490 | 490 | No | None | None | Annual Test. 14 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will continue to monitor monthly. |
| 403230990 | Form 17 | 11/15/2022 | 11/16/2022 | SHUT-IN | 22 | CONTINUOUS | GAS | 0 | WHISPER | 750 | 750 | No | -- | -- | Abatement system follow up test. 22 PSI whisper gas blew down to 0 PSI in 30 minutes. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 4/15/2022 | 5/9/2022 | | 19 | Continuous | -- | 0 | No Flow | 800 | 800 | No | No | No | |
| 402734733 | Form 17 | 6/24/2021 | 6/30/2021 | SHUT-IN | 73 | CONTINUOUS | -- | 8 | CONTINUOUS | 800 | 800 | No | -- | -- | Post-Production - Monthly Follow-up. 73 PSI blew down to 8 PSI within thirty minutes. PDC will submit sundry with bradenhead details as soon as possible. PDC will schedule a sampling event and submit results via form 43. |
| 402734753 | Form 17 | 5/17/2021 | 6/30/2021 | PLUNGER LIFT | 68 | CONTINUOUS | -- | 29 | CONTINUOUS | 682 | 687 | No | -- | -- | Post-Production - Monthly Follow-up. 68 PSI blew down to 29 PSI within thirty minutes. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. |
| Click for Specifics | Light | 8/11/2020 | 12/3/2020 | | 2 | | -- | 0 | No Flow | 500 | 500 | No | No | No | |
| Click for Specifics | Light | 6/11/2019 | 11/27/2019 | | 0 | | | 0 | No Flow | 440 | 440 | No | No | No | |