| 403673915 | Form 17 | 1/31/2024 | 2/1/2024 | SHUT-IN | 132 | CONTINUOUS | GAS | 52 | CONTINUOUS | 0 | 0 | No | -- | -- | Annual test. 132 PSI strong gas for entire test, fluid started at 20 minute mark and continued for the remainder of the test. Pressure only reduced to 52 PSI in 30 minutes. Most recent sample from 10/2023. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403607631 | Form 17 | 11/27/2023 | 11/28/2023 | SHUT-IN | 40 | CONTINUOUS | GAS | 0 | NO FLOW | 520 | 520 | No | -- | -- | Pre-P&A. 40 PSI blew down to 0 PSI within first 10 minutes of test. No pressure or flow observed for the remainder of the test. PDC collected a sample 10/2023. |
| 403548067 | Form 17 | 9/28/2023 | 10/3/2023 | SHUT-IN | 14 | CONTINUOUS | GAS | 0 | WHISPER | 215 | 215 | Yes | -- | -- | Pre-P&A. 14 PSI whisper gas blew down to 0 PSI in 30 minutes. Fluid present from 22 minute mark lasting 2 minutes. PDC will schedule a sampling event and submit results via form 43. |
| 403282901 | Form 17 | 1/5/2023 | 1/9/2023 | SHUT-IN | 120 | CONTINUOUS | GAS | 20 | CONTINUOUS | 775 | 775 | Yes | -- | -- | Annual Test. 120 PSI blew down to 20 PSI in 30 minutes. Hard gas from start until 15 minute mark then whisper gas for remainder of test. Water began at 25 minute mark as well and continued for remainder of test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly. |
| 403053995 | Form 17 | 5/18/2022 | 5/19/2022 | SHUT-IN | 56 | CONTINUOUS | GAS | 36 | CONTINUOUS | 775 | 775 | No | -- | -- | Monthly Gauge High Pressure Follow-Up, 56 PSI gas flow blew down to 36 PSI in 30 minutes. Gas flow present for the duration of the test, water flow began at 10 minutes and lasted the remainder of the test. Sample collected 4/12/2022. PDC will continue to monitor monthly. See doc# 402971952 for Wellbore Diagram. |
| 402971946 | Form 17 | 3/2/2022 | 3/3/2022 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Abatement system follow up test. No pressure or flow observed. PDC will submit sundry with bradenhead details if needed as soon as possible. PDC will continue to monitor monthly. |
| 402865470 | Form 17 | 8/16/2021 | 11/9/2021 | SHUT-IN | 100 | WHISPER | GAS AND VAPOR | 5 | WHISPER | 7 | 7 | Yes | -- | -- | Post-production, 100 PSI whisper gas and vapor blew down to 5 PSI in thirty minutes. PDC will submit sundry with bradenhead details as soon as possible. PDC will schedule a sampling event and submit results via form 43. |
| 402719661 | Form 17 | 3/3/2021 | 6/15/2021 | SHUT-IN | 12 | NO FLOW | -- | 0 | | 0 | 0 | No | -- | -- | Abatement system follow up test. No pressure or flow observed. PDC will submit sundry with bradenhead details as soon as possible. |
| 402456986 | Form 17 | 7/30/2020 | 7/30/2020 | SHUT-IN | 80 | GAS | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Annual Test, 80 PSI blew down to 0 PSI within first min of test. No pressure or flow observed for the remainder of test. PDC will attempt to collect a sample and submit a remeidation sundry. |
| 402242407 | Form 17 | 11/8/2019 | 11/18/2019 | PLUNGER LIFT | 250 | GAS | -- | 130 | GAS | 685 | 685 | Yes | Yes | -- | Annual bradenhead testing. Bradenhead flowed gas, no fluid. Bradenhead will be sampled and results to be uploaded into EDD when available. |