Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-31530STROHAUER F
32-24
PDC ENERGY INC
69175
PA
5/10/2024
WATTENBERG
90750
WELD  123
SWSE 32 5N65W 6
417001
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 834 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
403674204Form 171/31/20242/1/2024SHUT-IN30CONTINUOUS GASTSTM WHISPER 00No----Annual test. 30 PSI whisper gas for entire test. PDC will monitor pressure and re-test according to bradenhead policy.
403618578Form 1712/4/202312/7/2023SHUT-IN250CONTINUOUS GAS0 CONTINUOUS 680680No----Pre-P&A. 250 PSI continuous gas flow blew down to 0 PSI within thirty minutes.
403548100Form 179/28/202310/3/2023SHUT-IN15CONTINUOUS GAS0 CONTINUOUS 141141Yes----Pre P&A. 15 PSI continuous whisper gas blew down to 0 PSI in 30 minutes. PDC will schedule a sampling event and submit results via form 43.
Click for SpecificsFull1/5/20231/17/2023 0No Flow--0No Flow860860NoNoneNone 
403005587Form 174/5/20224/6/2022SHUT-IN55DOWN TO 0 VAPOR0 WHISPER 250250Yes----Monthly Gauge High Pressure Follow-Up, 55 PSI vapor flow blew down to 0 PSI within first minute of test. Vapor present for the duration of the test, no pressure observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly.
402971941Form 173/2/20223/3/2022SHUT-IN24DOWN TO 0 VAPOR0 NO FLOW 00No----Abatement system follow up test, 24 PSI vapor flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly.
402865464Form 178/16/202111/9/2021SHUT-IN64WHISPER GAS AND VAPOR0 NO FLOW 00Yes----Post-production, 64 PSI whisper vapor and gas blew down to 0 PSI within first 10 minutes. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will schedule a sampling event and submit results via form 43.
402719976Form 173/3/20216/16/2021SHUT-IN8CONTINUOUS WATER AND VAPOR0 CONTINUOUS 900900No----Abatement system follow up test, 8 PSI continuous vapor and water flow blew down to 0 PSI within thirty minutes. PDC will submit sundry with bradenhead details as soon as possible.
402464069Form 177/30/20208/11/2020 66WHISPER --0 WHISPER 900900Yes----Annual Test 66 PSI with continuous flow, blew down to 0 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry.
402242380Form 1711/8/201911/18/2019PLUNGER LIFT75GAS --0 NO FLOW 650645YesYes--Annual bradenhead test. Bradenhead blew gas for 5 minutes down to zero. Bradenhead will be sampled and results to be uploaded into EDD when available.