| 402263638 | Form 17 | 12/16/2019 | 12/16/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 350 | 350 | No | -- | -- | Zero psi on surface casing. No fluid, gas or vapors. |
| 402449747 | Form 17 | 11/24/2019 | 7/23/2020 | | 50 | GAS | -- | 0 | NO FLOW | 700 | 700 | Yes | -- | -- | Annual Test 50 PSI with continuous flow, blew down to 0 PSI after 30 min.
PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via
sundry. |
| 402250654 | Form 17 | 11/24/2019 | 11/29/2019 | PLUNGER LIFT | 50 | GAS | -- | 0 | NO FLOW | 700 | 700 | Yes | Yes | -- | Annual bradenhead test. Bradenhead flowed gas for first 10 minutes. Gas sampled and test results will be uploaded into EDD when available. |