401740698 | Form 17 | 8/21/2018 | 8/22/2018 | PLUNGER LIFT | 128 | GAS | -- | 1 | WHISPER | 15 | 15 | No | -- | -- | Surface casing produced no fluids. Blew down surface casing an extra 30 minutes ended with a whisper. Surface casing shut in for 15 minutes ended with 5 PSI. Well and master valve were shut in. |
401615985 | Form 17 | 4/3/2018 | 4/22/2018 | PLUNGER LIFT | 181 | GAS | -- | 1 | WHISPER | 1433 | 1434 | Yes | Yes | -- | Surface casing produced no fluids. Blew down surface casing an extra 30 minutes ended with a whisper. Surface casing shut in for 15 minutes ended with 9 PSI. Well and master shut in. |
401192305 | Form 17 | 1/4/2017 | 1/24/2017 | | 153 | GAS | -- | 1 | WHISPER | 434 | 445 | No | -- | -- | SURFACE CASING PRODUCED NO FLUIDS. BLEW DOWN SURFACE CASING AN EXTRA 30 MIN, ENDED WITH A WHISPER. SHUT IN SURFACE CASING FOR 15 MIN, ENDED WITH 4 PSI. |
400354543 | Form 17 | 10/4/2012 | 12/5/2012 | PLUNGER LIFT | 87 | GAS | -- | 0 | DOWN TO 0 | 333 | 370 | No | -- | -- | Well ran before test. |