| 402050129 | Form 17 | 5/16/2019 | 5/21/2019 | PLUNGER LIFT | 207 | GAS | -- | 1 | GAS | -- | -- | No | -- | -- | Surface casing produced no fluid. Well shut in for 15min ended with psi. Surface casing blown down an extra 30min ended with a
whisper. Tubing and casing shut in. |
| 401978562 | Form 17 | 3/8/2019 | 3/20/2019 | PLUNGER LIFT | 481 | GAS | -- | 1 | GAS | 1914 | 1914 | No | -- | -- | Surface casing blown down. Well shut in for 15min ended with psi. Well shut in an extra 30min ended with a whisper.
Tubing shut in. |
| 401887487 | Form 17 | 12/19/2018 | 12/27/2018 | PLUNGER LIFT | 344 | GAS | -- | 7 | GAS | 1876 | 1876 | No | -- | -- | Surface casing produced no fluids. Blew down surface casing an extra 30 minutes ended with a whisper. Surface casing shut in for 15 minutes ended with 15 PSI. Well and master valve were shut in. |
| 401315129 | Form 17 | 6/8/2017 | 6/21/2017 | | 410 | GAS | -- | 1 | WHISPER | -- | -- | No | -- | -- | SC PRODUCED NO FLUID. SHUT IN 15 MINS, BUILT UP TO 48 PSI. TUBING AND CASING WERE LOTO UPON ARRIVAL. |
| 401203742 | Form 17 | 12/19/2016 | 2/7/2017 | | 405 | GAS | -- | 1 | WHISPER | 661 | 662 | No | -- | -- | SURFACE CSG PRODUCED NO FLUIDS. BLEW DOWN SURFACE CSG FOR AN EXTRA 30 MINUTES; ENDED WITH A WHISPER. SHUT IN SURFACE CSG FOR 15 MIN.; ENDED WITH 32 PSI. |
| 400931729 | Form 17 | 10/8/2015 | 11/5/2015 | | 413 | GAS | -- | 1 | GAS | 672 | 674 | No | -- | -- | SC DID NOT PRODUCE ANY FLUID. 20 MIN BLOWDOWN, WHISPER. 15 MIN BUILD UP, 16. |
| 400489462 | Form 17 | 9/5/2013 | 10/2/2013 | PLUNGER LIFT | 399 | GAS | -- | <1 | GAS | 614 | 621 | No | -- | -- | SURFACE CASING PRODUCED NO FLUIDS DURING THE FORM 17 TEST. |
| 400318064 | Form 17 | 7/16/2012 | 8/20/2012 | PLUNGER LIFT | 283 | GAS | -- | 26 | GAS | 840 | 843 | No | -- | -- | Well was shut in, surface casing produced no fluid during from 17 test. |