403360526 | Form 17 | 3/30/2023 | 3/30/2023 | | 0 | NO FLOW | NONE | 0 | NO FLOW | 1012 | 1012 | No | -- | -- | Tubing Shut in. Surface Casing produced no liquid. |
Click for Specifics | Full | 2/8/2022 | 3/14/2022 | Plunger Lift | 21 | Continuous | None | -- | No Flow | 515 | 515 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
402747412 | Form 17 | 7/12/2021 | 7/14/2021 | | 18 | CONTINUOUS | GAS | 0 | NO FLOW | 1035 | 1033 | No | -- | -- | Tubing Shut in. Surface Casing produced no liquid. |
402643796 | Form 17 | 3/29/2021 | 3/30/2021 | | 3 | CONTINUOUS | GAS | 1 | WHISPER | 1032 | 1031 | No | -- | -- | Tubing Shut in. Surface Casing produced no liquid. |
402617671 | Form 17 | 2/25/2021 | 3/4/2021 | | 55 | CONTINUOUS | GAS | 1 | WHISPER | 966 | 964 | No | -- | -- | Tubing Shut in. Surface Casing produced no liquid. |
Click for Specifics | Full | 12/14/2020 | 12/21/2020 | Plunger Lift | 45 | Continuous | -- | -- | Whisper | 965 | 964 | No | No | No | Tubing Shut in. Surface Casing produced no liquid. |
Click for Specifics | Full | 10/25/2019 | 12/10/2019 | | 26 | Gas | | 0 | Down To Zero | 0 | 0 | No | No | No | Production casing and tubing shut in. Surface casing produced no liquid. |
400852040 | Form 17 | 6/1/2015 | 6/11/2015 | PLUNGER LIFT | 109 | GAS | -- | 1 | GAS | 985 | 986 | No | -- | -- | SC PRODUCED NO FLUID. POST REMEDIATION TEST. INITIAL TEST ON 5-27-15 SHOWED 119 PSI WITH GAS AND STILL WHISPERING AFTER 30 MINS. SHUT-IN FOR 15 MINS AND PRESSURED UP TO 8 PSI. |
400730375 | Form 17 | 10/8/2014 | 11/13/2014 | PLUNGER LIFT | 341 | GAS | -- | 198 | GAS | 336 | 349 | No | -- | -- | SC PRODUCED NO FLUIDS, MONITORED THE SC AN EXTRA 30 MINS, PRESSURE ENDED AT 51 PSI, SHUT THE SC IN FOR 15 MINS, PRESSURE BUILT UP TO 65 PSI |
400293679 | Form 17 | 5/14/2012 | 6/8/2012 | PLUNGER LIFT | 336 | GAS | -- | 215 | GAS | 317 | 331 | No | -- | -- | No fluid was produced during 30 minute blow down |