Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-29339MOSER
41-21
KERR MCGEE OIL & GAS ONSHORE LP
47120
PA
2/13/2024
WATTENBERG
90750
WELD  123
NWNE 21 3N65W 6
336444
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 728 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
403573447Form 1710/26/202310/26/2023 2CONTINUOUS GAS0 NO FLOW 11261126No----Tubing Shut in. Surface Casing produced no liquid.
Click for SpecificsFull9/19/202210/10/2022Plunger Lift0No FlowNone--No Flow211211NoNN Surface Casing produced no liquid.
Click for SpecificsFull9/19/202211/14/2022Plunger Lift14ContinuousNone--No Flow12141208NoNN Tubing Shut in. Surface Casing produced no liquid.
Click for SpecificsFull11/12/202112/6/2021Plunger Lift28ContinuousNone--Whisper11401140NoNN Tubing Shut in. Surface Casing produced no liquid.
402513033Form 1710/12/202010/16/2020 24CONTINUOUS --1 WHISPER 11631173No----Tubing Shut in. Surface Casing produced no liquid.
Click for SpecificsFull10/25/201912/10/2019 66Gas 1Whisper (Very Low Flow)12361236NoNoNoTubing shut in. Surface casing produced no liquid.
401032120Form 173/29/20164/20/2016 1GAS --0 DOWN TO 0 351351No----SC PRODUCED NO FLUIDS DURING TEST. SHUT IN SC FOR 15 MIN ENDED WITH A WHISPER. WELL SHUT IN UPON ARRIVAL.
400828197Form 174/7/20154/21/2015PLUNGER LIFT140GAS --0 DOWN TO 0 10721072No----POST REMEDIATION TEST. SURFACE CASING PRODUCED 1 GALLON OF WATER. AFTER 15 MINUTE SHUT-IN, SURFACE CASING BUILT BACK UP TO 25 PSI. MASTER VALVE CLOSED. WELL SHUT-IN AND TORE APART UPON ARRIVAL. INITIAL POST REMEDIATION BLOW-DOWN ON 4/2/15 STARTED AT 156 PSI, AND BLEW-DOWN TO 0 PSI.
400774472Form 171/13/20151/19/2015PLUNGER LIFT239GAS --132 GAS 290302No----SC PRODUCED NO FLUIDS, MONITORED SC AN EXTRA 30 MINS, PRESSURE ENDED AT 74 PSI, SI SC FOR 15 MINS, PRESSURE BUILT UP TO 84 PSI
400367728Form 1712/10/20121/10/2013PLUNGER LIFT260GAS --126 GAS 469476No----Surface casing produced no fluid during the form 17 test.