401740681 | Form 17 | 8/17/2018 | 8/22/2018 | PLUNGER LIFT | 131 | GAS | -- | 1 | WHISPER | 1705 | 1704 | No | -- | -- | Surface casing produced no fluids. Blew down surface casing an extra 30 minutes ended with a whisper. Surface casing shut in for 15 minutes ended with a whisper. Well and master valve were shut in. |
401654465 | Form 17 | 5/17/2018 | 5/25/2018 | | 125 | GAS | -- | 0 | DOWN TO 0 | -- | -- | Yes | Yes | -- | Surface casing produced no fluids. Surface casing shut in for 15 min ended with a whisper. Master valve and production casing were LOTO. |
400794544 | Form 17 | 1/27/2015 | 2/18/2015 | PLUNGER LIFT | 1 | GAS | -- | 0 | DOWN TO 0 | 789 | 792 | No | -- | -- | SURFACE CASING PRODUCED NO FLUIDS DURING TEST. SHUT THE SURFACE CASING IN FOR 15 MINUTES, PRESSURE STAYED AT 0 PSI. |