| 402282340 | Form 17 | 1/9/2020 | 1/10/2020 | | 73 | GAS | -- | 1 | GAS | -- | -- | Yes | Yes | -- | SURFACE CASING PRODUCED NO FLUIDS. TUBING AND PRODUCTION CASING LOTO. |
| Click for Specifics | Full | 9/12/2019 | 12/10/2019 | | 71 | Gas | | 0 | Down To Zero | 0 | 0 | No | No | No | Production casing and tubing shut in. Surface casing produced no liquid. |
| 401290006 | Form 17 | 5/19/2017 | 5/23/2017 | | 86 | GAS | -- | 1 | WHISPER | 116 | 117 | Yes | Yes | -- | SURFACE CASING PRODUCED NO FLUIDS. BLEW DOWN SURFACE CASING AN EXTRA 30 MIN ENDED WITH A WHISPER. SHUT IN SURFACE CASING FOR 15 MIN ENDED WITH 3 PSI. WELL AND MASTER SHUT IN. |
| 401076263 | Form 17 | 7/6/2016 | 7/11/2016 | | 76 | GAS | -- | 1 | GAS | 240 | 242 | No | -- | -- | SC PRODUCED NO FLUIDS DURING TEST . BLEW DOWN SC AN EXTRA 30 MIN ENDED WITH A WHISPER. SHUT IN SC FOR 15 MIN ENDED WITH 3 PSI. WELL AND MASTER SHUT IN UPON ARRIVAL. |
| 400878404 | Form 17 | 7/7/2015 | 8/20/2015 | PLUNGER LIFT | 52 | GAS | -- | >1 | GAS | 21 | 20 | No | -- | -- | POST REMEDIATION TEST. SURFACE CASING DID NOT PRODUCE ANY FLUID. 30 MIN. BUILD-UP, 3. TEMP SHUT-IN FOR HZ PREP TORN APART UPON ARRIVAL. INITIAL POST REMEDIATION BLOW DOWN ON 6/29/2015 STARTED WITH 76 PSI AND BLEW DOWN TO 0 PSI. |
| 400352984 | Form 17 | 10/16/2012 | 12/3/2012 | PLUNGER LIFT | 34 | GAS | -- | <1 | GAS | 370 | 387 | No | -- | -- | No fluid was produced during form 17 test. |