| 402050374 | Form 17 | 5/14/2019 | 5/21/2019 | PLUNGER LIFT | 82 | GAS | -- | 1 | GAS | 651 | 650 | No | -- | -- | Surface casing produced no fluid. Well shut in for 15min ended with a whisper. Tubing shut in. |
| 400857243 | Form 17 | 6/4/2015 | 6/23/2015 | PLUNGER LIFT | 30 | GAS | -- | 0 | GAS | 550 | 550 | No | -- | -- | POST REMEDIATION TEST. SC DID NOT PRODUCE ANY FLUID. 30 MIN BLOW DOWN, DEAD. 15 MIN BUILD-UP, WHIPSER. TEMP SHUT-IN FOR HZ PREP AND OPEN TO SALES UPON ARRIVAL. INITIAL POST REMEDIATION BLOW DOWN ON 5-29-2015 STARTED WITH 109 PSI AND BLEW DOWN TO ZERO PSI. |
| 400353107 | Form 17 | 10/16/2012 | 12/3/2012 | PLUNGER LIFT | 34 | GAS | -- | <1 | GAS | 365 | 385 | No | -- | -- | No transducer to surface casing. |