| 404487282 | Form 17 | 12/18/2025 | 12/29/2025 | SHUT-IN | 58 | CONTINUOUS | GAS | 0 | CONTINUOUS | 0 | 0 | No | -- | -- | |
| 404353159 | Form 17 | 9/3/2025 | 9/12/2025 | SHUT-IN | 60 | CONTINUOUS | GAS | 0 | WHISPER | 0 | 0 | No | -- | -- | Annual test. 60 PSI whisper gas blew down to 0 PSI in thirty minutes, whisper gas observed throughout entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404186839 | Form 17 | 4/16/2025 | 5/1/2025 | SHUT-IN | 110 | DOWN TO 0 | GAS | 0 | NO FLOW | 0 | 0 | No | -- | -- | Engineering Ad Hoc test. 110 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will schedule a sampling event and submit results via form 43. Operator will continue to monitor monthly. |
| Click for Specifics | Full | 9/23/2024 | 10/1/2024 | | 30 | Down to Zero | -- | 0 | No Flow | 0 | 0 | No | No | No | Annual Test. 30 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 9/5/2023 | 9/11/2023 | Shut In | 32 | Down to Zero | -- | 0 | Down to Zero | 655 | 655 | No | No | No | Annual Test. 32 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 9/28/2022 | 10/10/2022 | | 35 | Down to Zero | -- | 0 | Down to Zero | 760 | 760 | No | None | None | |
| Click for Specifics | Full | 10/6/2021 | 11/1/2021 | | 33 | Down to Zero | -- | 0 | No Flow | 1050 | 1050 | No | None | None | |
| Click for Specifics | Light | 10/7/2020 | 12/14/2020 | | 3 | | -- | 0 | | 728 | 728 | No | No | No | |
| 402415974 | Form 17 | 6/11/2019 | 6/8/2020 | FLOWING | 10 | CONTINUOUS | -- | 10 | CONTINUOUS | 950 | 950 | No | -- | -- | Annual Test 2019. This well was operated by SRC at the time the test was conducted, this form is being submitted to correct upload issues that were required for 2019 testing. PDC will re-test and if possible, collect a sample and submit results when available. 10 PSI maintained pressure for entire 30 min test |