Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-21504BRIGHT
10-4-5Y
KERR MCGEE OIL & GAS ONSHORE LP
47120
PA
4/23/2025
WATTENBERG
90750
WELD  123
NWSE 4 3N66W 6
331892
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 662 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404123021Form 173/11/20253/11/2025 5CONTINUOUS GAS0 NO FLOW 10741075No----PRE P/A- Tubing Shut in. Surface Casing produced no liquid.
Click for SpecificsFull5/31/20247/9/2024 7ContinuousNone--No Flow10261025NoNN Tubing Shut in. Surface Casing produced no liquid.
Click for SpecificsFull5/31/20246/10/2024 7ContinuousNone--No Flow10261025NoNN Tubing Shut in. Surface Casing produced no liquid.
Click for SpecificsFull5/31/20246/10/2024 7ContinuousNone--No Flow10261025NoNN Tubing Shut in. Surface Casing produced no liquid.
Click for SpecificsFull5/5/20236/28/2023Plunger Lift6ContinuousNone--Whisper956956NoNN Tubing Shut in. Surface Casing produced no liquid.
Click for SpecificsFull9/6/202211/14/2022Plunger Lift8ContinuousNone--No Flow984984NoNN Tubing Shut in. Surface Casing produced no liquid.
Click for SpecificsFull9/6/202210/10/2022Plunger Lift0No FlowNone--No Flow308308NoNN Surface Casing produced no liquid.
Click for SpecificsFull1/18/20212/16/2021Plunger Lift3ContinuousNone--No Flow785783NoNoNo Tubing Shut in. Surface Casing produced no liquid.
Click for SpecificsFull1/2/20206/8/2020 1Whisper (Very Low Flow) 0Down To Zero600599NoNoNoSurface casing produced no liquid.
Click for SpecificsFull2/25/201912/10/2019 7Water H2O 0Down To Zero430431NoNoNoSurface casing produced water insufficient for sampling.
400798329Form 172/3/20152/24/2015PLUNGER LIFT8CONTINUOUS --0 DOWN TO 0 364366No----SURFACE CASING PRODUCED HALF A GALLON OF CONDENSATE DURING TEST. SHUT THE SURFACE CASING IN FOR 15 MINUTES, PRESSURE BUILT UP TO A WHISPER.