Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-16545KINSMAN
34-18
PDC ENERGY INC
69175
SI
12/1/2023
WATTENBERG
90750
WELD  123
SWSE 18 4N65W 6
332734
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 395 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404057968Form 171/7/20251/14/2025SHUT-IN10DOWN TO 0 WATER AND GAS0 CONTINUOUS 00No----Remediation follow up test. 10 PSI gas and water flow, gas blew down to 0 PSI in first five minutes, water remained to trickle throughout entire test . PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull1/31/20242/5/2024Shut In7Down to Zero--0Down to Zero572572NoNoNoAnnual Test. 7 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
403301025Form 171/11/20231/25/2023SHUT-IN8DOWN TO 0 WATER AND GAS0 CONTINUOUS 561561No----Annual Test. 8 PSI gas and water blew down to 0 PSI within first minute of test. 1 pint water at open, then steady trickle for 2 minutes, then steady drip until 17 minute mark. On and off dripping for remainder of test. PDC will continue to monitor monthly.
403220478Form 1711/3/202211/7/2022SHUT-IN8DOWN TO 0 GAS0 NO FLOW 560560No----Annual Test. 8 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will continue to monitor monthly.
Click for SpecificsFull9/30/202111/1/2021 7Gas--0No Flow541541NoNoneNone 
402615137Form 1712/30/20203/2/2021 0DOWN TO 0 GAS0  505--No----Abatement system follow up test 0 PSI no pressure or flow, PDC will monitor pressure and re-test in 6 months.
Click for SpecificsLight10/6/202012/14/2020 0 --0 12001200NoNoNo 
402250639Form 1711/23/201911/29/2019PLUNGER LIFT10NO FLOW --0 NO FLOW 600600No----Annual bradenhead test.
400408033Form 173/29/20134/23/2013PLUNGER LIFT5WATER H20 --0 DOWN TO 0 309316No----Surface casing produced 1 gallon of H2O during the form 17 test.