| 404526993 | Form 17 | 1/26/2026 | 1/30/2026 | SHUT-IN | 28 | DOWN TO 0 | GAS | 1 | CONTINUOUS | 1067 | 1065 | No | -- | -- | |
| 404323750 | Form 17 | 8/1/2025 | 8/20/2025 | SHUT-IN | 16 | CONTINUOUS | GAS | 0 | NO FLOW | 1048 | 1048 | No | -- | -- | Remediation follow up test. 16 PSI blew down to 0 PSI within five minutes of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404087544 | Form 17 | 1/31/2025 | 2/10/2025 | SHUT-IN | 17 | CONTINUOUS | GAS | 1 | SURGE | 0 | 0 | No | -- | -- | Annual Test. 17 PSI blew down to 1 PSI within thirty minutes. Surge of water and gas at the end of test and continued for remainder of test. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 2/8/2024 | 2/19/2024 | Shut In | 12 | No Flow | -- | 0 | No Flow | 0 | 0 | No | No | No | Annual Test. 12 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403301111 | Form 17 | 1/13/2023 | 1/25/2023 | SHUT-IN | 14 | DOWN TO 0 | GAS | 0 | CONTINUOUS | 900 | 900 | No | -- | -- | Annual Test. 14 PSI gas blew down to 0 PSI within first minute of test. Fluid trickle started at 13 minute mark and continued through the remainder of the test. PDC will continue to monitor monthly. |
| 403194302 | Form 17 | 9/27/2022 | 10/11/2022 | SHUT-IN | 14 | DOWN TO 0 | GAS | 5 | CONTINUOUS | 0 | 0 | Yes | -- | -- | Annual Test. 14 PSI gas flow blew down to 0 PSI within first minute of test. Steady stream of water started at 20 minute mark and pressure at end of test was 5 PSI. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 10/26/2021 | 11/22/2021 | | 20 | Down to Zero | -- | 0 | No Flow | 800 | 800 | No | None | None | |
| 402615345 | Form 17 | 12/15/2020 | 3/3/2021 | | 0 | DOWN TO 0 | GAS | 0 | NO FLOW | 350 | 350 | No | -- | -- | Abatement system follow up test 0 PSI no pressure or flow, PDC will monitor pressure and re-test in 6 months. |
| Click for Specifics | Light | 11/7/2020 | 12/14/2020 | | 0 | | -- | 0 | | 0 | 0 | No | No | No | |
| 402244297 | Form 17 | 11/18/2019 | 11/20/2019 | PLUNGER LIFT | 20 | WATER H20 | -- | 0 | CONTINUOUS | 140 | 140 | Yes | -- | Yes | Annual bradenhead testing. Bradenhead flowed water continuously during test. Fluid will be sampled and results uploaded into EDD when available. |
| 1796685 | Form 17 | 5/4/1994 | 8/19/2009 | FLOWING | 400 | | -- | -- | | -- | 400 | No | -- | -- | |