| 403009227 | Form 17 | 4/8/2022 | 4/8/2022 | | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Tubing Shut in. Surface Casing produced no liquid. Surface casing was only shut in 24 hours prior to test. |
| Click for Specifics | Full | 11/3/2021 | 12/6/2021 | Plunger Lift | 0 | No Flow | None | -- | No Flow | 35 | 35 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 12/10/2020 | 12/21/2020 | Plunger Lift | 1 | Whisper | -- | -- | No Flow | 26 | 26 | No | No | No | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 12/2/2019 | 12/20/2019 | | 1 | Gas | -- | 0 | Down To Zero | -- | -- | No | No | No | Production casing and tubing shut in. Surface casing produced no liquid. |
| 400728510 | Form 17 | 10/3/2014 | 11/11/2014 | PLUNGER LIFT | 1 | GAS | -- | 0 | DOWN TO 0 | 187 | 187 | No | -- | -- | SURFACE CASING PRODUCED NO FLUIDS DURING TEST. SHUT THE SURFACE CASING IN FOR 15 MINUTES PRESSURE STAYED AT 0 PSI. WELL SHUT IN AND MASTER VALVE CLOSED UPON ARRIVAL |