| 402741239 | Form 17 | 2/26/2021 | 7/8/2021 | SHUT-IN | 50 | WHISPER | GAS | 1 | WHISPER | 50 | 50 | Yes | -- | -- | Pre P&A, 50 PSI continuous whisper gas flow blew down to 1 PSI within thirty minutes. PDC will submit sundry with bradenhead details as soon as possible. PDC will schedule a sampling event and submit results via form 43. |
| 402871624 | Form 17 | 1/28/2021 | 11/16/2021 | SHUT-IN | 54 | CONTINUOUS | GAS | 0 | NO FLOW | 15 | 15 | Yes | -- | -- | Post-production, 54 PSI gas flow blew down to 0 PSI in 20 minutes. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. |
| 402871630 | Form 17 | 12/18/2020 | 11/16/2021 | SHUT-IN | 69 | WHISPER | GAS | 3 | WHISPER | 0 | 0 | Yes | -- | -- | Post-production, 69 PSI whisper gas blew down to 3 PSI in 30 minutes. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. |
| 402542347 | Form 17 | 11/29/2020 | 11/30/2020 | SHUT-IN | 53 | CONTINUOUS | GAS AND LIQUID HYDROCARBON | 2 | WHISPER | 0 | 0 | No | -- | -- | Abatement System follow up test 53 PSI slight gas and liquid flow blew down to whisper 2 PSI within first minute of test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible.
|
| 402420956 | Form 17 | 4/1/2020 | 6/12/2020 | | 40 | VAPOR | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402091744 | Form 17 | 6/14/2019 | 6/28/2019 | PLUNGER LIFT | 48 | GAS | -- | 2 | WHISPER | 980 | 948 | Yes | Yes | -- | Annual Test 48 PSI whisper blew down to 2 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |