| 404420252 | Form 17 | 10/29/2025 | 11/3/2025 | FLOWING | 0 | WHISPER | GAS | 0 | NO FLOW | 1047 | 1042 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403804804 | Form 17 | 5/20/2024 | 5/28/2024 | PLUNGER LIFT | 140 | NO FLOW | NONE | 0 | NO FLOW | 1079 | 1079 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 403543439 | Form 17 | 9/27/2023 | 9/27/2023 | PLUNGER LIFT | 83 | CONTINUOUS | GAS | 0 | NO FLOW | 990 | 991 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 5/16/2022 | 6/13/2022 | Flowing | 270 | N/A | -- | 266 | N/A | 1495 | 1496 | No | No | No | Tied In |
| 402911444 | Form 17 | 12/20/2021 | 12/29/2021 | FLOWING | 826 | CONTINUOUS | GAS | 46 | CONTINUOUS | 2521 | 2532 | No | -- | -- | |