| 404420075 | Form 17 | 10/29/2025 | 11/6/2025 | PLUNGER LIFT | 0 | WHISPER | GAS | 0 | NO FLOW | 759 | 761 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 2 inch valve. Well cycled during test. |
| 403804196 | Form 17 | 5/20/2024 | 5/28/2024 | PLUNGER LIFT | 23 | NO FLOW | NONE | 0 | NO FLOW | 1091 | 1253 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 403554361 | Form 17 | 10/5/2023 | 10/9/2023 | FLOWING | 6 | CONTINUOUS | GAS | 0 | NO FLOW | 643 | 644 | No | -- | -- | These annual tests were performed after a seven-day bradenhead shut-in period. The bradenhead is connected to the sales separator with an approved pressure management plan. The bradenhead test was performed through a 2" valve and the intermediate casing test was performed through a 1/2" valve.. |
| Click for Specifics | Full | 5/16/2022 | 6/13/2022 | Flowing | 270 | N/A | -- | 268 | N/A | 1576 | 1576 | No | No | No | Tied In |
| 402931705 | Form 17 | 1/19/2022 | 1/20/2022 | FLOWING | 1027 | CONTINUOUS | WATER H20 | 0 | NO FLOW | 2974 | 2984 | No | -- | -- | |