| 404398199 | Form 17 | 10/20/2025 | 10/21/2025 | PUMPING | 90 | CONTINUOUS | GAS | 0 | NO FLOW | 148 | 148 | Yes | Yes | -- | RESAMPLE OF THE BRADENHEAD GAS. POSSIBLE CONTAMINATION OF THE FIRST SAMPLE FROM THE FLOWLINE BACKFEEDING THROUGH THE CHECK VALVES.
|
| 404327177 | Form 17 | 8/20/2025 | 8/22/2025 | PUMPING | 100 | CONTINUOUS | GAS | 0 | NO FLOW | 140 | 140 | Yes | Yes | -- | 7 DAY BUILD UP. SURFACE CASING TIED INTO FLOWLINE. GAS SAMPLE TAKEN. SAMPLE ID: 05-103-10532
|
| Click for Specifics | Full | 3/26/2025 | 4/7/2025 | | 60 | Continuous | -- | 0 | No Flow | 90 | 90 | No | No | No | BH tied to flowline |
| Click for Specifics | Light | 3/27/2024 | 4/3/2024 | | 10 | | -- | 0 | | 130 | 130 | No | No | No | 7 day build up. Braden head tied to flowline. |
| Click for Specifics | Full | 3/16/2023 | 4/4/2023 | Pumping | 80 | Continuous | -- | 0 | No Flow | 180 | 180 | No | No | No | |
| Click for Specifics | Full | 3/16/2022 | 4/4/2022 | Pumping | 234 | Continuous | -- | 0 | No Flow | 210 | 210 | No | No | No | 7 Day build up pressure. Tied to flowline. |
| 402638383 | Form 17 | 3/16/2021 | 3/24/2021 | PUMPING | 360 | CONTINUOUS | GAS | 0 | DOWN TO 0 | 91 | 91 | Yes | Yes | -- | |