Click for Specifics | Full | 8/21/2024 | 9/4/2024 | | 136 | Continuous | -- | 0 | No Flow | 110 | 110 | No | No | No | 7 day build-up. Braden head tied to flowline. |
Click for Specifics | Light | 8/15/2023 | 9/5/2023 | ESP | 48 | | -- | 0 | | 90 | 90 | No | No | No | |
Click for Specifics | Full | 8/24/2022 | 9/6/2022 | Pumping | 156 | Continuous | -- | 0 | No Flow | 125 | 125 | No | No | No | 7 day build-up. Bradenhead is tied to the flowline. |
402790166 | Form 17 | 8/16/2021 | 8/24/2021 | PUMPING | 278 | CONTINUOUS | GAS | 2.7 | WHISPER | 108 | 108 | No | -- | -- | Well has approved pressure management plan (Doc# 402436482) in place to flow the bradenhead to sales. We will continue to follow the approved plan to maintain a pressure below the pressure limit.
THIS WELL AREADY HAS SURFACE CASING OPEN TO THE FLOWLINE SO THIS TEST IS FROM A 7 DAY SURFACE CASING SHUT IN AND BUILD UP. |
402429390 | Form 17 | 6/23/2020 | 6/23/2020 | PUMPING | 395 | CONTINUOUS | -- | 0 | WHISPER | 85 | 95 | Yes | -- | Yes | |