| 404551832 | Form 17 | 2/19/2026 | 2/20/2026 | INJECTION | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Observation well converted to injection. The surface casing has been zero since the rig got off of it. |
| 404327234 | Form 17 | 8/20/2025 | 8/22/2025 | FLOWING | 160 | CONTINUOUS | GAS | 0 | DOWN TO 0 | 0 | 0 | Yes | Yes | -- | 7 DAY BUILD UP. SURFACE CASING TIED INTO FLOWLINE. GAS SAMPLE TAKEN. SAMPLE ID: 05-103-06140
|
| Click for Specifics | Full | 7/14/2025 | 8/4/2025 | | 61 | Continuous | -- | 0 | No Flow | 250 | 250 | No | No | No | Observation well status. |
| Click for Specifics | Full | 7/9/2024 | 8/6/2024 | | 180 | Continuous | -- | 0 | Down to Zero | 0 | 0 | No | No | No | Observation well status. Plan to tie BH to flowline in place |
| Click for Specifics | Full | 7/11/2023 | 7/31/2023 | Shut-In | 148 | Continuous | -- | 0 | No Flow | 0 | 0 | No | No | No | |
| Click for Specifics | Full | 7/11/2022 | 8/9/2022 | Shut-In | 121 | Continuous | -- | 0 | No Flow | 0 | 0 | No | No | No | |
| Click for Specifics | Full | 7/11/2021 | 8/9/2021 | Shut-In | 198.9 | Continuous | -- | 0 | Down to Zero | 137 | 137 | No | No | No | |