Click for Specifics | Full | 11/4/2024 | 12/2/2024 | | 110 | Continuous | -- | 0 | No Flow | 0 | 0 | No | No | No | |
Click for Specifics | Light | 11/16/2023 | 12/4/2023 | Injection | 0 | | -- | 0 | | 24 | 24 | No | No | No | |
Click for Specifics | Light | 11/10/2022 | 12/5/2022 | Injection | 20 | | -- | 0 | | 0 | 0 | No | No | No | |
402870635 | Form 17 | 11/12/2021 | 11/15/2021 | INJECTION | 1 | WHISPER | GAS | 0 | DOWN TO 0 | 0 | 0 | No | -- | -- | Bradenhead down to zero in three seconds; Intermediate Casing down to zero in one second.
This Bradenhead test was performed per the approved Bradenhead Plan Condition of Approval. |
402649083 | Form 17 | 3/31/2021 | 4/6/2021 | INJECTION | 8 | CONTINUOUS | GAS | 0 | DOWN TO 0 | 8 | 0 | Yes | Yes | -- | GAS SMELLED LIKE PACKER FLUID, POSSIBLE COMMUNICATION BETWEEN SURFACE AND PRODUCTION CASING. WILL CONDUCT AN MIT. |