| Click for Specifics | Full | 7/9/2025 | 7/29/2025 | | 300 | Whisper | Liquid Hydrocarbon | -- | Down To Zero | 102 | 103 | Yes | No | Yes | |
| 403883368 | Form 17 | 7/22/2024 | 8/8/2024 | SHUT-IN | 0 | DOWN TO 0 | GAS AND LIQUID HYDROCARBON | 0 | NO FLOW | 106 | -- | No | -- | -- | |
| Click for Specifics | Full | 7/18/2023 | 9/25/2023 | Shut-In | 0 | Continuous | -- | -- | No Flow | 80 | 80 | No | No | No | |
| 403270297 | Form 17 | 12/15/2022 | 12/22/2022 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 110 | 110 | No | -- | -- | |
| 402954805 | Form 17 | 2/8/2022 | 2/11/2022 | SHUT-IN | 0 | DOWN TO 0 | NONE | 0 | NO FLOW | 129 | 129 | No | -- | -- | Flameless heater placed on bradenhead valve for ~10 minutes prior to test. Bradenhead pressure was -9 PSI, then stabilized shortly after beginning the Form 17 test. |