| Click for Specifics | Full | 5/20/2025 | 6/9/2025 | | 200 | N/A | -- | 0 | No Flow | 994 | 1038 | No | No | No | 2" BH, CYCLED DURING TEST |
| 403949130 | Form 17 | 10/3/2024 | 10/8/2024 | PLUNGER LIFT | 371 | CONTINUOUS | GAS | 0 | NO FLOW | 1302 | 1315 | No | -- | -- | TEP had initiated an diagnostic evaluation due to the threshold pressure exceedance. |
| 403772745 | Form 17 | 4/29/2024 | 4/29/2024 | PLUNGER LIFT | 352 | CONTINUOUS | GAS | 0 | WHISPER | 1293 | 1304 | No | -- | -- | The test was performed through a 1/2" valve and TEP has initiated diagnostic testing due to the bradenhead exceeding the threshold pressure. |
| 403664147 | Form 17 | 1/23/2024 | 1/23/2024 | FLOWING | 341 | CONTINUOUS | GAS | 0 | NO FLOW | 1804 | 1813 | No | -- | -- | The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 11/9/2023 | 12/11/2023 | Flowing | 77 | N/A | -- | 0 | No Flow | 2450 | 2450 | No | No | No | 1/2" bh. FLOWBACK. |