| 404223907 | Form 17 | 5/27/2025 | 5/30/2025 | PLUNGER LIFT | 111 | CONTINUOUS | GAS | 0 | NO FLOW | 344 | 346 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 2 inch valve. Well cycled during test. |
| 403668717 | Form 17 | 1/26/2024 | 1/29/2024 | FLOWING | 340 | CONTINUOUS | GAS | 0 | NO FLOW | 1361 | 1361 | No | -- | -- | The test was performed through a 2" valve. |
| Click for Specifics | Full | 12/5/2023 | 12/11/2023 | Flowing | 2 | N/A | -- | 0 | No Flow | 2150 | 2150 | No | No | No | 1/2 bh |