| 404179061 | Form 17 | 4/23/2025 | 4/25/2025 | PLUNGER LIFT | 347 | CONTINUOUS | GAS | 0 | NO FLOW | 194 | 191 | No | -- | -- | This is an annual bradenhead test that was performed on day one of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 0.5 inch valve. Well cycled during test. |
| 403810855 | Form 17 | 5/29/2024 | 6/3/2024 | PLUNGER LIFT | 354 | NO FLOW | NONE | 0 | NO FLOW | 168 | 167 | No | -- | -- | This is an annual bradenhead test that was performed on Day One of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403366266 | Form 17 | 4/5/2023 | 4/5/2023 | PLUNGER LIFT | 349 | CONTINUOUS | GAS | 0 | WHISPER | 181 | 182 | No | -- | -- | This is an annual bradenhead test that was performed on the second day of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 3/14/2023 | 4/10/2023 | Plunger Lift | 124 | N/A | -- | 0 | No Flow | 182 | 184 | No | No | No | 1/2" blowdown |
| Click for Specifics | Full | 3/25/2022 | 4/18/2022 | Plunger Lift | 351 | N/A | -- | 0 | No Flow | 335 | 339 | No | No | No | |
| Click for Specifics | Full | 6/1/2021 | 7/12/2021 | Plunger Lift | 172 | N/A | -- | 410 | N/A | 410 | 410 | No | No | No | Bradenhead is tied into the tubing. |