| 404184626 | Form 17 | 4/24/2025 | 4/30/2025 | PLUNGER LIFT | 350 | CONTINUOUS | GAS | 0 | WHISPER | 167 | 165 | No | -- | -- | This is an annual bradenhead test that was performed on day two of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. Well cycled during test. |
| 403810725 | Form 17 | 5/30/2024 | 6/3/2024 | PLUNGER LIFT | 355 | NO FLOW | NONE | 0 | NO FLOW | 213 | 213 | No | -- | -- | This is an annual bradenhead test that was performed on Day Two of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403367010 | Form 17 | 4/6/2023 | 4/6/2023 | PLUNGER LIFT | 346 | CONTINUOUS | GAS | 0 | DOWN TO 0 | 203 | 203 | No | -- | -- | This is an annual bradenhead test that was performed on the third day of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 3/14/2023 | 4/10/2023 | Plunger Lift | 136 | N/A | -- | 0 | Whisper | 207 | 206 | No | No | No | 1/2" blowdown |
| Click for Specifics | Full | 10/21/2022 | 11/8/2022 | Plunger Lift | 144 | N/A | -- | 0 | No Flow | 160 | 164 | No | No | No | 1/2 valve |
| 402713170 | Form 17 | 6/2/2021 | 6/9/2021 | PLUNGER LIFT | 365 | CONTINUOUS | GAS | 12 | CONTINUOUS | 501 | 500 | No | -- | -- | |
| Click for Specifics | Full | 6/1/2021 | 7/12/2021 | Plunger Lift | 365 | N/A | -- | 0 | Continuous | 501 | 500 | No | No | No | |