| 404116761 | Form 17 | 3/3/2025 | 3/5/2025 | SHUT-IN | 2 | DOWN TO 0 | NONE | 0 | NO FLOW | 380 | 380 | No | -- | -- | This Form 17 submittal is associated with post-workover operations and a COA attached to ECMC Doc# 404050540. |
| 403998766 | Form 17 | 11/18/2024 | 11/19/2024 | PLUNGER LIFT | 233 | CONTINUOUS | GAS | 198 | CONTINUOUS | 220 | -- | No | -- | -- | The bradenhead test was stopped after ten minutes due to the production casing pressure trending with the surface casing pressure and potential safety concerns. TEP has initiated an diagnostic evaluation due to the threshold pressure exceedance and the test results. The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 1/31/2024 | 2/5/2024 | Plunger Lift | 2 | N/A | -- | 0 | No Flow | 244 | 244 | No | No | No | 1/2 bh |
| Click for Specifics | Full | 6/21/2023 | 7/17/2023 | Plunger Lift | 1 | N/A | -- | 0 | No Flow | 225 | 235 | No | No | No | 1/2 bh |
| Click for Specifics | Full | 3/30/2022 | 4/18/2022 | Plunger Lift | 0 | N/A | -- | 0 | No Flow | 233 | 231 | No | No | No | Blow down 1/2” |
| Click for Specifics | Full | 7/30/2021 | 8/9/2021 | Plunger Lift | 0 | N/A | -- | 0 | No Flow | 245 | 233 | No | No | No | |
| Click for Specifics | Light | 10/1/2019 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 10/1/2017 | 6/2/2020 | | 6 | | | 0 | | -- | -- | Yes | Yes | No | |