| 404209415 | Form 17 | 5/15/2025 | 5/19/2025 | PLUNGER LIFT | 152 | CONTINUOUS | GAS | 0 | NO FLOW | 242 | 270 | No | -- | -- | This is an annual bradenhead test that was performed on day one of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. Well cycled during test. |
| Click for Specifics | Full | 2/15/2024 | 3/19/2024 | Plunger Lift | 148 | N/A | -- | 148 | N/A | 419 | 419 | No | No | No | 1/2 bh tied into flowline |
| 403432496 | Form 17 | 6/12/2023 | 6/13/2023 | PLUNGER LIFT | 232 | CONTINUOUS | GAS | 0 | WHISPER | 249 | 256 | No | -- | -- | The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 4/1/2022 | 5/16/2022 | Plunger Lift | 0 | N/A | -- | 0 | No Flow | 209 | 198 | No | No | No | Blow down 1/2” |
| Click for Specifics | Full | 5/13/2021 | 6/7/2021 | Plunger Lift | 0 | N/A | -- | 0 | No Flow | 196 | 197 | No | No | No | |
| Click for Specifics | Light | 10/1/2019 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 10/1/2017 | 6/2/2020 | | 10 | | | 0 | | -- | -- | Yes | Yes | No | |
| Click for Specifics | Light | 1/1/2016 | 6/2/2020 | | 29 | | | 0 | | -- | -- | Yes | No | Yes | |