| 404214382 | Form 17 | 5/21/2025 | 5/22/2025 | PLUNGER LIFT | 269 | CONTINUOUS | GAS | 0 | NO FLOW | 162 | 159 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 1/2 inch valve. Well cycled during test. |
| 403692898 | Form 17 | 2/20/2024 | 2/20/2024 | PLUNGER LIFT | 105 | CONTINUOUS | GAS | 0 | NO FLOW | 158 | 155 | No | -- | -- | This is an annual bradenhead test using the ECMC approved pilot testing procedure for 2024 which does not involve a seven-day shut-in of the connected bradenhead prior to performing the test. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve. |
| 403349233 | Form 17 | 3/17/2023 | 3/17/2023 | PLUNGER LIFT | 283 | CONTINUOUS | GAS | 0 | WHISPER | 172 | 167 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 10/14/2022 | 11/8/2022 | Plunger Lift | 110 | N/A | -- | 0 | No Flow | 147 | 150 | No | No | No | 1/2" Blowdown |
| Click for Specifics | Full | 10/6/2021 | 10/25/2021 | Plunger Lift | 455 | N/A | -- | 30 | Continuous | 200 | 200 | No | No | No | |
| 402781793 | Form 17 | 8/16/2021 | 8/16/2021 | PLUNGER LIFT | 460 | CONTINUOUS | GAS | 3 | WHISPER | 184 | 185 | No | -- | -- | |
| 402291255 | Form 17 | 1/23/2020 | 1/29/2020 | PLUNGER LIFT | 190 | CONTINUOUS | -- | 0 | DOWN TO 0 | 190 | 185 | No | -- | -- | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 160 | | -- | -- | No | No | No | |