| 404179655 | Form 17 | 4/25/2025 | 4/25/2025 | PLUNGER LIFT | 408 | CONTINUOUS | GAS | 0 | WHISPER | 148 | 143 | No | -- | -- | This is an annual bradenhead test that was performed on day two of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 1/2 inch valve. Well cycled during test. |
| 403665653 | Form 17 | 1/23/2024 | 1/24/2024 | PLUNGER LIFT | 126 | CONTINUOUS | GAS | 0 | NO FLOW | 157 | 156 | No | -- | -- | This is an annual bradenhead test using the ECMC approved pilot testing procedure for 2024 which does not involve a seven-day shut-in of the connected bradenhead prior to performing the test. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve. |
| 403327235 | Form 17 | 2/22/2023 | 2/22/2023 | PLUNGER LIFT | 414 | CONTINUOUS | GAS | 0 | NO FLOW | 134 | 131 | No | -- | -- | This is an annual bradenhead test that was performed on second day of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 10/19/2022 | 11/8/2022 | Plunger Lift | 110 | N/A | -- | 0 | No Flow | 133 | 136 | No | No | No | 1/2 valve |
| 402810579 | Form 17 | 9/10/2021 | 9/14/2021 | PLUNGER LIFT | 449 | CONTINUOUS | GAS | 0 | NO FLOW | 139 | 144 | No | -- | -- | |
| Click for Specifics | Full | 7/26/2021 | 8/9/2021 | Plunger Lift | 145 | N/A | -- | 0 | No Flow | 148 | 148 | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 0 | | -- | -- | No | No | No | |