| 404078323 | Form 17 | 1/30/2025 | 2/3/2025 | INJECTION | 413 | CONTINUOUS | GAS | 0 | WHISPER | 400 | 389 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 403701868 | Form 17 | 2/28/2024 | 2/28/2024 | INJECTION | 100 | CONTINUOUS | GAS | 0 | WHISPER | 19 | 18 | No | -- | -- | This is an annual bradenhead test using the ECMC approved pilot testing procedure for 2024 which does not involve a seven-day shut-in of the connected bradenhead prior to performing the test. The bradenhead is connected to the Clough 2A sales line with an approved pressure management plan. The test was performed through a 1/2" needle valve. |
| 403308902 | Form 17 | 1/24/2023 | 2/1/2023 | INJECTION | 521 | CONTINUOUS | GAS | 0 | WHISPER | 16 | 16 | No | -- | -- | Test was performed through a 1/2" valve. |
| Click for Specifics | Full | 3/17/2022 | 4/18/2022 | Injection | 185 | N/A | -- | 0 | Whisper | 5 | 5 | No | No | No | 1/2” blowdown |
| Click for Specifics | Full | 8/13/2021 | 9/6/2021 | Injection | 508 | N/A | -- | 0 | Continuous | 0 | 0 | No | No | No | Blown down through 1/2 inch needle valve |
| 402783178 | Form 17 | 8/10/2021 | 8/17/2021 | INJECTION | 386 | CONTINUOUS | GAS AND VAPOR | 2 | CONTINUOUS | 0 | 0 | No | -- | -- | |
| 401923061 | Form 17 | 1/29/2019 | 1/30/2019 | SHUT-IN | 582 | CONTINUOUS | -- | 0 | WHISPER | 195 | 185 | No | -- | -- | Bradenhead pressure at the start of test 582 psig, 108 psig after 5 minutes, 9 psig after 10 minutes, and down to 0 after 15 minutes had elapsed. |