| 404324679 | Form 17 | 8/15/2025 | 8/21/2025 | CLOCK/INTERMITTER | 512 | CONTINUOUS | GAS | 0 | NO FLOW | 207 | 225 | No | -- | -- | This is an annual bradenhead test that was performed on day one of the seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. TEP Rocky Mountain LLC has received ECMC approval to not test the intermediate casing due to safety concerns associated with the testing process. |
| 403693855 | Form 17 | 2/21/2024 | 2/21/2024 | PLUNGER LIFT | 199 | CONTINUOUS | GAS | 0 | NO FLOW | 213 | 185 | No | -- | -- | This is an annual bradenhead test using the ECMC approved pilot testing procedure for 2024 which does not involve a seven-day shut-in of the connected bradenhead prior to performing the test. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve. TEP Rocky Mountain LLC (TEP) has received ECMC approval to not test the intermediate casing annulus due to safety concerns associated with the testing process. |
| 403361505 | Form 17 | 3/30/2023 | 3/31/2023 | PLUNGER LIFT | 575 | CONTINUOUS | GAS | 0 | NO FLOW | 263 | 269 | No | -- | -- | This is an annual bradenhead test that was performed on day three of a seven-day shut-in period. The bradenhead is connected to the sales separator with an approved pressure management plan. Both tests were performed through a 1/2" valve. |
| Click for Specifics | Full | 2/7/2022 | 3/7/2022 | Flowing | 286 | N/A | -- | 0 | No Flow | 230 | 230 | No | No | No | 1/2 valve. 7 day build up. |
| Click for Specifics | Full | 10/5/2021 | 10/25/2021 | Plunger Lift | 322 | N/A | -- | 0 | No Flow | 237 | 237 | No | No | No | |
| 402694204 | Form 17 | 5/18/2021 | 5/19/2021 | PLUNGER LIFT | 322 | CONTINUOUS | GAS | 0 | NO FLOW | 237 | 251 | No | -- | -- | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 0 | | -- | -- | No | No | No | |