| 404296050 | Form 17 | 7/28/2025 | 7/28/2025 | PLUNGER LIFT | 108 | CONTINUOUS | WATER AND GAS | 0 | NO FLOW | 153 | 151 | No | -- | -- | This Form 17 is being submitted to satisfy a COA attached to Doc# 404080081. The test was performed through a 1/2" valve and the well cycled during the test. |
| 404184667 | Form 17 | 4/29/2025 | 4/30/2025 | PLUNGER LIFT | 199 | CONTINUOUS | GAS | 0 | NO FLOW | 158 | 163 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2 inch valve. Well cycled during test. |
| 404030355 | Form 17 | 12/16/2024 | 12/16/2024 | PLUNGER LIFT | 329 | CONTINUOUS | GAS | 0 | WHISPER | 128 | 126 | No | -- | -- | TEP has initiated a diagnostic evaluation of the well due to the bradenhead threshold pressure exceedance. The bradenhead test was performed through a 1/2" valve. |
| Click for Specifics | Full | 1/23/2024 | 2/5/2024 | Plunger Lift | 299 | N/A | -- | 0 | No Flow | 132 | 130 | No | No | No | 1/2" Blowdown |
| Click for Specifics | Full | 2/10/2023 | 3/15/2023 | Plunger Lift | 235 | N/A | -- | 0 | No Flow | 138 | 139 | No | No | No | 1/2 valve |
| Click for Specifics | Full | 10/19/2022 | 11/8/2022 | Plunger Lift | 166 | N/A | -- | 0 | No Flow | 134 | 139 | No | No | No | |
| Click for Specifics | Full | 5/13/2021 | 6/7/2021 | Plunger Lift | 199 | N/A | -- | 0 | No Flow | 138 | 143 | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 130 | | -- | -- | No | No | No | |