| 404292017 | Form 17 | 7/21/2025 | 7/24/2025 | PLUNGER LIFT | 241 | CONTINUOUS | GAS | 0 | WHISPER | 134 | 121 | No | -- | -- | TEP has initiated a diagnostic evaluation due to the threshold pressure exceedance. The test was performed through a 1/2" valve and the well cycled during the test. |
| Click for Specifics | Full | 2/19/2024 | 3/19/2024 | Plunger Lift | 211 | N/A | -- | 0 | Whisper | 143 | 144 | No | No | No | 1/2: BD |
| Click for Specifics | Full | 1/23/2023 | 2/7/2023 | Plunger Lift | 180 | N/A | -- | 0 | No Flow | 143 | 148 | No | No | No | 1/2 blowdown |
| Click for Specifics | Full | 2/1/2022 | 3/7/2022 | Plunger Lift | 49 | N/A | -- | 0 | No Flow | 149 | 153 | No | No | No | 1/2 valve |
| Click for Specifics | Full | 5/19/2021 | 6/7/2021 | Plunger Lift | 0 | N/A | -- | 0 | Down to Zero | 142 | 145 | No | No | No | |
| 402291333 | Form 17 | 1/23/2020 | 1/29/2020 | PLUNGER LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 140 | 142 | No | -- | -- | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 0 | | -- | -- | No | No | No | |