| 404213432 | Form 17 | 5/20/2025 | 5/22/2025 | PLUNGER LIFT | 0 | NO FLOW | NONE | 0 | NO FLOW | 234 | 225 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. Well cycled during test. |
| 403807530 | Form 17 | 5/29/2024 | 5/30/2024 | PLUNGER LIFT | 32 | CONTINUOUS | GAS | 0 | NO FLOW | 233 | 237 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| Click for Specifics | Full | 6/21/2023 | 7/17/2023 | Plunger Lift | 36 | N/A | -- | 36 | N/A | 220 | 220 | No | No | No | tied into sales |
| Click for Specifics | Full | 3/14/2022 | 4/18/2022 | Plunger Lift | 60 | N/A | -- | 60 | N/A | 207 | 209 | No | No | No | tied into tubing |
| Click for Specifics | Full | 6/30/2021 | 7/12/2021 | Shut-In | 56 | N/A | -- | 0 | Down to Zero | 204 | 205 | No | No | No | Tied into flow line. |
| 402321295 | Form 17 | 2/21/2020 | 2/24/2020 | SHUT-IN | 151 | GAS | -- | 0 | DOWN TO 0 | 188 | 196 | No | -- | -- | Bradenhead will be left open and added to the flow test list per Craig Burger. |
| Click for Specifics | Light | 6/19/2019 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/9/2017 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/15/2016 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 11/29/2010 | 6/2/2020 | | -- | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 11/9/2010 | 6/2/2020 | | -- | | | -- | | -- | -- | No | No | No | |