| 404256416 | Form 17 | 6/19/2025 | 6/25/2025 | PLUNGER LIFT | 136 | CONTINUOUS | GAS | 0 | NO FLOW | 304 | 307 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403799994 | Form 17 | 5/22/2024 | 5/22/2024 | PLUNGER LIFT | 122 | CONTINUOUS | GAS | 0 | WHISPER | 316 | 293 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| Click for Specifics | Full | 6/26/2023 | 7/17/2023 | Plunger Lift | 67 | N/A | -- | 67 | N/A | 319 | 320 | No | No | No | Tied In |
| Click for Specifics | Full | 4/11/2022 | 5/16/2022 | Plunger Lift | 79 | N/A | -- | 79 | N/A | 322 | 313 | No | No | No | tied into tubing |
| Click for Specifics | Full | 7/14/2021 | 8/9/2021 | Flowing | 102 | N/A | -- | 76 | Surge | 271 | 279 | No | No | No | Tied into flowline. |
| 402586988 | Form 17 | 1/28/2021 | 2/1/2021 | SHUT-IN | 151 | CONTINUOUS | GAS | 0 | NO FLOW | 247 | 249 | No | -- | -- | |
| Click for Specifics | Light | 6/19/2019 | 6/2/2020 | | 30 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/9/2017 | 6/2/2020 | | 18 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/22/2016 | 6/2/2020 | | 27 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/22/2011 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/7/2011 | 6/2/2020 | | -- | | | -- | | -- | -- | No | No | No | |