| 404256451 | Form 17 | 6/19/2025 | 6/25/2025 | PLUNGER LIFT | 146 | CONTINUOUS | GAS | 0 | NO FLOW | 138 | 148 | No | -- | -- | This is an annual bradenhead test that was performed on day three of the seven-day shut-in period before threshold pressure was reached for environmental and safety concerns. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403796304 | Form 17 | 5/17/2024 | 5/20/2024 | PLUNGER LIFT | 152 | CONTINUOUS | GAS | 0 | WHISPER | 227 | 189 | No | -- | -- | This is an annual bradenhead test that was performed on Day Three of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| Click for Specifics | Full | 6/26/2023 | 7/17/2023 | Plunger Lift | 44 | N/A | -- | 41 | N/A | 286 | 286 | No | No | No | Tied In |
| Click for Specifics | Full | 4/11/2022 | 5/16/2022 | Plunger Lift | 77 | N/A | -- | 77 | N/A | 248 | 245 | No | No | No | tied into tubing |
| Click for Specifics | Full | 7/14/2021 | 8/9/2021 | Shut-In | 72 | N/A | -- | 72 | Surge | 163 | 187 | No | No | No | Tied into flowline. |
| 402334477 | Form 17 | 3/5/2020 | 3/6/2020 | SHUT-IN | 153 | GAS | -- | 0 | NO FLOW | 190 | 192 | No | -- | -- | Bradenhead left open and to flow testing list per Craig Burger. |
| Click for Specifics | Light | 6/19/2019 | 6/2/2020 | | 36 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/9/2017 | 6/2/2020 | | 43 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/22/2016 | 6/2/2020 | | 48 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/12/2011 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 4/25/2011 | 6/2/2020 | | -- | | | -- | | -- | -- | No | No | No | |