| 404256490 | Form 17 | 6/19/2025 | 6/25/2025 | CLOCK/INTERMITTER | 75 | CONTINUOUS | GAS | 0 | NO FLOW | 63 | 71 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403799202 | Form 17 | 5/21/2024 | 5/21/2024 | CLOCK/INTERMITTER | 92 | CONTINUOUS | GAS | 0 | NO FLOW | 246 | 279 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| Click for Specifics | Full | 6/26/2023 | 7/17/2023 | Plunger Lift | 42 | N/A | -- | 42 | N/A | 292 | 292 | No | No | No | Tied In |
| 403255370 | Form 17 | 12/8/2022 | 12/9/2022 | PLUNGER LIFT | 154 | CONTINUOUS | GAS | 0 | NO FLOW | 269 | 266 | No | -- | -- | Test performed through a 2" valve. |
| Click for Specifics | Full | 4/11/2022 | 5/16/2022 | Plunger Lift | 135 | N/A | -- | 0 | No Flow | 206 | 207 | No | No | No | 2 inch ball valve |
| Click for Specifics | Full | 7/14/2021 | 8/9/2021 | Shut-In | 138 | N/A | -- | 0 | No Flow | 404 | 406 | No | No | No | |
| Click for Specifics | Light | 6/19/2019 | 6/2/2020 | | 30 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/9/2017 | 6/2/2020 | | 40 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 6/22/2016 | 6/2/2020 | | 38 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/28/2011 | 6/2/2020 | | 35 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 5/12/2011 | 6/2/2020 | | -- | | | -- | | -- | -- | No | No | No | |