| 404385049 | Form 17 | 10/8/2025 | 10/9/2025 | PLUNGER LIFT | 153 | CONTINUOUS | GAS | 0 | SURGE | 467 | 462 | No | -- | -- | TEP has initiated a diagnostic evaluation due to the bradenhead threshold pressure exceedance. The bradenhead test was performed through 1/2" inch valve. A WBD is being prepared and will be submitted via a Form 4. |
| Click for Specifics | Full | 5/19/2025 | 6/9/2025 | | 142 | N/A | -- | 0 | Whisper | 306 | 309 | No | No | No | 1/2 valve |
| Click for Specifics | Full | 6/19/2024 | 7/9/2024 | | 141 | N/A | -- | 0 | No Flow | 251 | 250 | No | No | No | 1/2" BH |
| Click for Specifics | Full | 6/30/2023 | 7/17/2023 | Plunger Lift | 136 | N/A | -- | 0 | No Flow | 242 | 238 | No | No | No | 1/2" Blowdown |
| 403006242 | Form 17 | 3/31/2022 | 4/6/2022 | PLUNGER LIFT | 156 | CONTINUOUS | GAS | 4 | CONTINUOUS | 319 | 319 | No | -- | -- | Test performed through 1/2"valve |
| Click for Specifics | Full | 7/14/2021 | 8/9/2021 | Plunger Lift | 133 | N/A | -- | 10 | Continuous | 263 | 268 | No | No | No | |
| Click for Specifics | Light | 10/12/2018 | 6/2/2020 | | 145 | | | 146 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 9/19/2017 | 6/2/2020 | | 111 | | | 113 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 10/7/2016 | 6/2/2020 | | 111 | | | 111 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 12/24/2014 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 1/15/2012 | 6/2/2020 | | 0 | | | 0 | | -- | -- | No | No | No | |