| 404094364 | Form 17 | 2/14/2025 | 2/14/2025 | PLUNGER LIFT | 170 | CONTINUOUS | GAS | 0 | WHISPER | 260 | 263 | No | -- | -- | This is an annual bradenhead test that was performed on day two of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403843825 | Form 17 | 7/1/2024 | 7/2/2024 | PLUNGER LIFT | 141 | CONTINUOUS | GAS | 0 | WHISPER | 267 | 278 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. |
| Click for Specifics | Full | 6/16/2023 | 7/17/2023 | Plunger Lift | 86 | N/A | -- | 86 | N/A | 281 | 289 | No | No | No | Tied in |
| Click for Specifics | Full | 2/17/2022 | 3/7/2022 | Clock/Intermitter | 120 | N/A | -- | 120 | N/A | 298 | 298 | No | No | No | tied in |
| Click for Specifics | Full | 6/29/2021 | 7/12/2021 | Shut-In | 115 | N/A | -- | 115 | N/A | 312 | 312 | No | No | No | bradenhead is tied into tubing and selling. |
| 401806558 | Form 17 | 10/13/2018 | 10/23/2018 | PLUNGER LIFT | 157 | GAS | -- | 0 | DOWN TO 0 | 324 | 324 | No | -- | -- | Bradenhead psi at start was 157, blew down bradenhead thru 1/2 inch needle valve at end of test bradenhead psi was at 0. |
| Click for Specifics | Light | 10/12/2018 | 6/2/2020 | | 134 | | | 134 | | -- | -- | No | No | No | |
| Click for Specifics | Light | 9/19/2017 | 6/2/2020 | | 0 | | | 67 | | -- | -- | No | No | No | |
| 401138222 | Form 17 | 10/22/2016 | 10/27/2016 | PLUNGER LIFT | 177 | GAS | -- | 33 | GAS | 471 | 475 | No | -- | -- | Blew down for 30min through 1/2" needle valve.
|
| Click for Specifics | Light | 10/7/2016 | 6/2/2020 | | 177 | | Gas | 33 | | -- | -- | Yes | Yes | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | 150 | | Gas | 0 | | -- | -- | Yes | Yes | No | |
| Click for Specifics | Light | 12/24/2014 | 6/2/2020 | | 150 | | Gas | 0 | | -- | -- | Yes | Yes | No | * Blow down thru 2 inch line, took approx 1 min. to lite blow, 4 min. to 0 psi, all gas, blowdown daily |
| 400492379 | Form 17 | 10/2/2013 | 10/9/2013 | PLUNGER LIFT | 150 | GAS | -- | .2 | WHISPER | 468 | 473 | No | -- | -- | Braden head blew down to a whisper immediately and stayed for the remainder of the test. |
| 400334452 | Form 17 | 8/20/2012 | 10/8/2012 | FLOWING | 175 | GAS | -- | 0 | VAPOR | 575 | 581 | No | -- | -- | |
| 400248199 | Form 17 | 2/1/2012 | 2/2/2012 | FLOWING | 150 | CONTINUOUS | -- | 0 | CONTINUOUS | 918 | 920 | No | -- | -- | The producing formation is WMFK. Bradenhead flow complete letter designations for the bradenhead test elapsed time periods are as follows: C & G (00:00), C & G (05:00), C, W & G (10:00), C, W & G (15:00), C, W & G (20:00), C, W & G (25:00), C, W & G (30:00). |
| Click for Specifics | Light | 1/22/2011 | 6/2/2020 | | 20 | | | 0 | | -- | -- | No | No | No | |